Chenab raging at Marala Headworks after water discharge from India

Lahore (HRNW) The water level in River Chenab on the rise at Marala Headworks in Sialkot district and other points after water discharged from India in the river.

The inflow of Chenab at Head Marala in Sialkot district has been recorded 76,400 cusecs of water, while it flowing out with 54,300 cusecs at the point, according to the irrigation department of Punjab.

The inflow of Chenab River at Head Khanki in Gujranwala district has been recorded 92,800 cusecs, while the discharge of the water at the point has been measured 84,500 cusecs.

The inflow of Chenab River at Qadirabad Headworks in Mandi Bahauddin district has been gauged at 1,08,600 cusecs, while its outflow has been recorded at 78,500 cusecs.

Increasing water flow in Chenab has caused flooding in outfall drains linked to the river and several villages and low-lying areas in Chak Bhatti, Narowal, Mehmoodpur have submerged.

Be the first to comment on "Chenab raging at Marala Headworks after water discharge from India"

Leave a comment

Your email address will not be published.


*