Karachi (HRNW) Efforts are being made to revive the oxygen plant of Pakistan Steel Mills to meet shortages during the third wave of coronavirus.
A technical team reached PSM on the instructions of the federal government.
A meeting was chaired by PSM CEO Shuja Hassan to look into to the possibility of reviving the defunct oxygen gas plant.
“The plant will be restored soon,” the CEO said. “The machinery required in the plant will be installed. Pakistan Army engineers will assist in the process of reviving the plant.”
Be the first to comment on "Steel Mills gears up to produce 50,000 cylinders of oxygen"